• head_banner_01

News

Walk-in constant temperature and humidity room use steps

The utilization of a walk-in constant temperature and humidity test chamber necessitates a series of meticulous steps, outlined as follows:

 

1. Preparation Phase:

     a) Deactivate the test chamber and position it in a stable, well-ventilated area.

     b) Thoroughly sanitize the interior to eliminate any dust or foreign particles.

     c) Verify the integrity of the power socket and cord associated with the test chamber.

2. Initialization of Power:

     a) Activate the power switch of the test chamber and confirm the supply of power.

     b) Observe the power indicator on the test box to ascertain a successful connection to the power source.

3. Parameter Configuration:

     a) Utilize the control panel or computer interface to establish the necessary temperature and humidity settings.

    b) Validate that the established parameters align with the stipulated test standards and specific requirements.

4. Preheating Protocol:

     a) Allow the internal temperature and humidity of the chamber to stabilize at the set values, contingent upon the specific preheating requirements.

    b) The duration of preheating can vary based on the chamber’s dimensions and the parameters set.

5. Sample Placement:

     a) Position the test samples on the designated platform within the chamber.

     b) Ensure adequate spacing between samples to facilitate proper air circulation.

6. Sealing the Test Chamber:

     a) Secure the chamber door to guarantee a hermetic seal, thereby preserving the integrity of the controlled test environment.

7. Initiate the Testing Process:

     a) Initiate the test chamber’s software program to initiate a consistent temperature and humidity testing routine.

     b) Continuously monitor the progress of the test using the integrated control panel.

8. Ongoing Test Surveillance:

   a) Keep a vigilant eye on the sample’s status via the viewing window or through advanced monitoring equipment.

   b) Modify temperature or humidity settings as necessitated during the testing phase.

9. Conclude the Test:

     a) Upon the completion of the pre-set time or when the conditions are met, halt the test program.

     b) Safely open the test chamber door and extract the sample.

10. Data Synthesis and Evaluation:

     a) Document any alterations in the sample and meticulously record the pertinent test data.

     b) Scrutinize the test outcomes and appraise the sample’s performance in line with the test criteria.

11. Sanitization and Upkeep:

     a) Thoroughly cleanse the interior of the test chamber, encompassing the test platform, sensors, and all accessories.

     b) Conduct routine checks and maintenance on the chamber’s sealing integrity, cooling and heating systems.

     c) Schedule regular calibration sessions to uphold the chamber’s measurement precision.

12. Documentation and Reporting:

     a) Maintain comprehensive logs of all test parameters, procedures, and outcomes.

     b) Draft an in-depth test report that includes the methodology, results analysis, and final conclusions.

Walk-in constant temperature and humidity room

  Kindly note that the operational procedures may differ across various test chamber models. It is imperative to thoroughly review the equipment’s instruction manual prior to conducting any tests.


Post time: Nov-21-2024